What should be in a septic work proposal
This is not about comparing proposals against each other — that is a separate exercise. This is about reading one proposal and telling whether it is finished.
The pattern behind most septic disputes is boringly consistent: the price was fine and the scope was silent. Restoration, disposal, permits, access and what happens if something unexpected is found underground are the five places silence becomes expensive.
The diagnosis section
A proposal should be able to say what problem it is solving and how that was established. If it cannot, the work is being proposed on an assumption.
- What was found, described as observation rather than conclusion.
- How it was found — pumped and inspected, probed, camera, excavated, or reported by the homeowner.
- What was not assessed, and why.
- What the proposed work is expected to achieve, stated in terms that could later be checked.
The scope section
Scope is the list of physical things that will happen. Each line below is somewhere a proposal can be silent and a change order can later appear.
| Item | What the proposal should settle |
|---|---|
| Components | Exactly which parts are being replaced, repaired or left alone. |
| Excavation | Whether digging is included, how much, and to what depth. |
| Pumping | Whether emptying the tank is included or billed separately. |
| Disposal | Where excavated material and pumped waste go, and who pays. |
| Restoration | What the ground will look like afterwards — backfilled, graded, topsoiled, seeded, or none of those. |
| Access | Route for machinery, and what is expected to be moved, protected or crossed. |
| Landscaping | What will be damaged, and whether anything will be reinstated. |
| Electrical | Who does any electrical work, and whether it is included. |
| Utility locating | Who arranges it, and before which date. |
| Permits | Who applies, who pays the fee, and who schedules the inspection. |
| Materials | Sizes, materials and specifications rather than generic descriptions. |
| Reconnection | How the new work joins the parts that are staying. |
The exclusions section
A proposal with no exclusions section is not a proposal without exclusions. It is a proposal where the exclusions have not been written down yet.
Asking for them is not adversarial. A contractor who has done this work for years knows exactly what tends to come up, and putting it in writing protects both sides.
- Rock, ledge or unexpected ground conditions.
- Groundwater requiring dewatering.
- Additional components found to be failed once excavation begins.
- Existing plumbing inside the building.
- Repairs required by an inspector that were not part of the original scope.
- Restoration beyond backfill and rough grade.
- Anything on a neighbouring property or in a right of way.
The conditions and change-order section
Underground work reveals things. The question is not whether that happens but what the agreed process is when it does.
- What has to be true before work can start — permit issued, weather, access, payment.
- Who is authorised to approve a change, and how that authorisation is recorded.
- Whether work stops for approval, or continues on a stated basis.
- How additional work is priced — a rate, a schedule, or a fresh quote.
- What happens if the permit process requires something different from what was proposed.
Warranty, payment and completion
- What is warranted — workmanship, materials, or both — and for how long.
- What voids it, in plain terms.
- Whether the warranty covers the performance of the system or only the work performed.
- The payment schedule, and what each stage is tied to.
- What constitutes completion, and whether it depends on an inspection passing.
- What documentation you receive at the end — as-built, inspection sign-off, invoice detail, photographs.
What a complete proposal does not need to contain
Two things are worth not demanding, because insisting on them tends to produce a worse proposal rather than a better one.
- A guarantee that the system will perform for a stated number of years. Nobody can honestly give that, and a proposal that does is either excluding so much that the guarantee is hollow, or is priced for the risk.
- A fixed price for work that genuinely cannot be scoped until the ground is open. A stated rate and a stop-work-for-approval clause is more honest than a fixed price that will be revised.
Using this before you sign
Read the proposal once for what it says, then once against the tables above for what it does not. Write your questions down and send them in one message rather than several — you will get better answers and a written record.
If you are weighing more than one proposal against each other, the comparison worksheet lays the same fields side by side so a difference in price can be traced to a difference in scope.
The five silences that become change orders
Across septic work, the same handful of omissions account for most of the difference between the agreed figure and the final invoice. None of them is exotic.
| Silence | How it surfaces later |
|---|---|
| Restoration | The excavation is backfilled and left as bare, rutted ground. Nobody said it would be graded and seeded, and nobody said it would not. |
| Disposal | Pumped waste, spoil and the old tank all have to go somewhere. If the proposal is silent, the cost of removal can appear afterwards. |
| Permits | Who applies, who pays and who books the inspection. Discovering the answer is "you" a week before work starts is a scheduling problem as well as a cost. |
| Access | Which route the machinery takes and what gets crossed or moved. Fences, gates, irrigation and paving all become questions on the morning. |
| Unknown ground | Rock, groundwater or an additional failed component. Without an agreed process, the first you hear is a phone call from a site that has already stopped. |
How to read a proposal that is priced as a range
A range is not automatically evasive. Some septic work genuinely cannot be scoped precisely until the ground is open, and a contractor who says so is being honest rather than difficult.
What makes a range acceptable is what accompanies it.
- What is included at the bottom of the range, stated as a scope rather than as a caveat.
- What specific findings would move the figure toward the top.
- The rate applied to anything beyond the range, so an overrun is arithmetic rather than negotiation.
- A stop-work-for-approval clause, so you decide before the cost is incurred.
- A commitment that the basis of the final figure will be documented — what was found, and what it required.
Turning your questions into an answerable message
Contractors answer written questions better than verbal ones, and the answers become part of the record. A short structured message gets a far better response than a phone call and a list.
- Group the questions by section — diagnosis, scope, exclusions, terms — rather than as a flat list.
- Quote the line from the proposal you are asking about, so nobody is guessing which item you mean.
- Ask for the answers in writing, and say that you will treat the replies as part of the agreed scope.
- Send them once rather than in three messages over a week.
- Keep the reply with the proposal. When the work is done, that pair is what tells you whether it matched.
Common questions
Is it reasonable to ask for all of this?
Yes, and most established contractors already cover much of it. The request that occasionally causes friction is restoration, because it is the item most often left deliberately vague. Asking is still reasonable.
What if the contractor says they cannot quote until they dig?
That can be entirely legitimate for some work. The answer is not a fixed price but a written basis: what is included at the quoted figure, what triggers additional cost, at what rate, and that work stops for your approval first.
Should the proposal include a permit?
It should at least state who is responsible for obtaining one and who pays the fee. What permit is required is decided by the authority with jurisdiction over the property, and it differs between neighbouring jurisdictions.
Does a lower price mean a worse proposal?
No, and neither does a higher one. It usually means a different scope. The point of reading it this way is to find out which — a genuinely cheaper contractor and a proposal that excludes restoration and disposal look identical until you check.